Unev pipeline
Lua error in package.lua at line 80: module 'strict' not found.
Unev Pipeline | |
---|---|
Location | |
Country | United States |
From | Woods Cross, Utah |
To | Las Vegas Valley |
General information | |
Type | Oil products |
Partners | Holly Corporation Sinclair Oil |
Operator | UNEV Pipeline, LLC |
Commissioned | 2011 (operational in 2012) |
Technical information | |
Length | Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). |
Maximum discharge | 60,000 million barrels per day (~3.0×10 12 t/a) |
Diameter | Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). |
The UNEV pipeline is an 399-mile (642 km) long[1] pipeline from Woods Cross, Utah, USA, to the Las Vegas Valley at the Apex Industrial Park. This 53-acre (21 ha) facility has the capacity to store 330,000 barrels (52,000 m3) of product. Expansion of the North Las Vegas Terminal will be completed in 2014. An additional terminal facility, the 30-acre (12 ha) Cedar City Terminal, is located in Cedar City, Utah, with the capacity to store 200,000 barrels (32,000 m3) of product.
This line is the second oil pipeline for Las Vegas, adding capacity and a second source to the Calnev Pipeline. Completion was planned for operation in the spring of 2011. Commencement of operations was delayed to 2012 and is now operational.[2]
History
The $300,000,000 pipeline has an initial capacity of 62,000 barrels per day (9,900 m3/d) with a maximum capacity of 118,000 barrels per day (18,800 m3/d).[3]
By May 2011, construction of the southern end of the pipeline was progressing in Moapa, Nevada.[4]
UNEV Pipeline, LLC.
The pipe is owned and operated by UNEV Pipeline, LLC. which is a partnership between Holly Corporation (75%) and Sinclair Oil (25%).[5]
Notes
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.[dead link]
- Lua error in package.lua at line 80: module 'strict' not found. - ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "HollyFrontier Corporation and Holly Energy Partners Announce Completion of Acquisition of Interest in UNEV Pipeline", HollyFrontier Corporation / Holly Energy Partners news release, July 12, 2012
- Pages with reference errors
- Nevada articles missing geocoordinate data
- Utah articles missing geocoordinate data
- Energy infrastructure completed in 2012
- Refined oil product pipelines in the United States
- Transportation in the Las Vegas Valley
- Energy resource facilities in Nevada
- Buildings and structures in Clark County, Nevada
- Energy resource facilities in Utah
- Buildings and structures in Davis County, Utah
- Oil pipeline companies
- Articles with dead external links from June 2016