San Emidio Geothermal Plant

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

San Emidio Geothermal Plant, in Washoe County, Nevada, is a geothermal power plant with a design capacity of 11.8 megawatts (15,800 hp). The upgraded plant went online on May 25, 2012.[1][2]

History

The plant is the second to occupy the site. The older 3.6-megawatt (4,800 hp) plant, originally known as the Empire Geothermal Plant, which was sold by Empire Geothermal Power LLC to U.S. Geothermal Inc. in 2008,[3] was commissioned in 1987. Phase I of the reconstruction added an 8.6-megawatt (11,500 hp) generator.[1][2][4][5]

Future expansions

  • Phase II (3Q 2013)[5]
  • Phase III with 17.2 megawatts (23,100 hp)[4]

Notes

<templatestyles src="Reflist/styles.css" />

Cite error: Invalid <references> tag; parameter "group" is allowed only.

Use <references />, or <references group="..." />

Lua error in package.lua at line 80: module 'strict' not found.


<templatestyles src="Asbox/styles.css"></templatestyles>

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.