Chula-Siam Monorail

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Chula - Siam Monorail
Overview
Owner Bangkok Metropolitan Administration
Locale Bangkok, Thailand
Transit type Monorail Rapid transit
Number of lines 3
Number of stations 11 (planned)
Operation
Began operation 2016 (est.)
Technical
System length 6.7 km (4.16 mi) (planned)

Chula-Siam Monorail was a proposed monorail rapid transit system in Bangkok, Thailand. The line was proposed by BMA with cooperation from Chulalongkorn University. The system would have consisted of 3 routes around Chulalongkorn University area. The first routes were planned to begin construction around early 2012 along Phaya Thai Road from Sam Yan to Siam Square, connecting Siam Station of BTS Skytrain and Sam Yan Station of MRT Blue Line.[1]

See also

References

<templatestyles src="Reflist/styles.css" />

Cite error: Invalid <references> tag; parameter "group" is allowed only.

Use <references />, or <references group="..." />
  • Lua error in package.lua at line 80: module 'strict' not found.

  1. http://www.thannews.th.com/index.php?option=com_content&view=article&id=40555:5000-&catid=129:2009-02-08-11-47-38&Itemid=479