BTS Skytrain
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Native name | บริษัท ระบบขนส่งมวลชนกรุงเทพ จำกัด (มหาชน) (บีทีเอส) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Bangkok Metropolitan Administration (BMA) Mass Rapid Transit Authority of Thailand (Bearing-Samut Prakan/Mo Chit-Saphan Mai Extension) |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Bangkok, Thailand | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Transit type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of lines | 2[1][2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of stations | 34[1][2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 600,000[3] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Began operation | 5 December 1999 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Bangkok Mass Transit System Public Company Limited |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of vehicles | 47 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System length | 36.45 km (22.65 mi)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Third rail 750 V DC | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Average speed | 35 km/h (22 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Top speed | 80 km/h (50 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Bangkok Mass Transit System, commonly known as the BTS or the Skytrain (Thai: รถไฟฟ้า rot fai fa), is an elevated rapid transit system in Bangkok, Thailand. It is operated by Bangkok Mass Transit System Public Company Limited (BTSC) under a concession granted by the Bangkok Metropolitan Administration (BMA). The system consists of 34 stations along two lines: the Sukhumvit Line running northwards and eastwards, terminating at Mo Chit and Bearing respectively, and the Silom Line which serves Silom and Sathon Roads, the central business district of Bangkok, terminating at the National Stadium and Bang Wa. The lines interchange at Siam Station and have a combined route length of 36.45 kilometers (22.65 mi). The system is formally known as the Elevated Train in Commemoration of HM the King's 6th Cycle Birthday (รถไฟฟ้าเฉลิมพระเกียรติ 6 รอบ พระชนมพรรษา).
Besides the BTS, Bangkok's rapid transit system includes the underground railway line MRT, and the elevated Suvarnabhumi Airport Link (SARL), serving several stations in the city before reaching the airport.
Contents
History
Bangkok's first attempt at building an elevated rail network was the Bangkok Elevated Road and Train System (BERTS), which was terminated in 1998 after only 10 percent had been completed.
The BTS system (the elevated metro system owned by Bangkok Metropolitan Administration) was initially referred to as the Lavalin Skytrain because designed using the Vancouver SkyTrain as a model, adopting technology developed by SNC-Lavalin. Due to political interference, the concession with Lavalin was cancelled in 1992, in spite of Bangkok's chronic traffic congestion. The Thai Government focused on increasing road and expressway infrastructure in an attempt to combat congestion. However, this had less than the desired impact as the number of cars on the road increased dramatically. The lines considered under the Skytrain project became later the basis for the MRT system and are mainly underground.
In the early 1990s, foundations and a viaduct for the Lavalin Skytrain were constructed in the middle of the Phra Pok Klao Bridge which crosses the Chao Phraya River. (The planned metro bridge remains unused but may be utilised as part of the MRT's future Purple Line). Shortly after it became clear that the Lavalin Skytrain had stalled, then-governor Major General Chamlong Srimuang asked his deputy, Captain Kritsada Arunwong na Ayutthaya, to create a new feeder system with a route along Sukhumvit and Silom Roads. Krisda, who in the same period was elected governor, and his team from the Bangkok Metropolitan Administration (BMA) managed to find an investor to build it. Krisda also convinced all to let the city supervise the project. The investor founded the Bangkok Transit System Corporation (BTSC) and this company successfully financed the system and grew it from a feeder system to a full mass transit project. Thanayong Public Company Limited (SET: TYONG,[4] Thai: บริษัท ธนายง จำกัด (มหาชน)) had a 28.21 percent stake in BTSC when the Skytrain began, and therefore in its early days the system was sometimes referred to as the "Thanayong Skytrain".
Siemens, the supplier of the railway technology, and the Thai contractor, Italian Thai Development, built the system for BTSC. The "Skytrain" name was bestowed later by the press following the Vancouver example where the elevated metro had been named Skytrain. Originally, the Skytrain depot was to be built underneath Lumphini Park, but due to widespread objections from Bangkok residents it was constructed on a parcel of land on Phahonyothin Road, replacing the old northern/northeastern bus terminal (Mo Chit). The current depot at Mo Chit is a part of the proposed "Bangkok Terminal" project, where a large complex composed of a new regional bus terminal, park and ride facility, and other commercial development can be built directly above it.
The Skytrain system was officially opened on 5 December 1999 by Princess Maha Chakri Sirindhorn. It initially had lower-than-predicted ridership, with 200,000 passenger trips per day. Ticket revenue was only enough to meet the trains' operating cost, and not sufficient to service construction loans. However, the Skytrain's daily passenger numbers have steadily increased since then. On 9 December 2005, more than 500,000 single trips were made on the Skytrain on a single day for the first time. By September 2012, the Skytrain served around 600,000 passengers on an average day, increasing to 650,000 on an average weekday in 2013. A record 760,000 passengers traveled on Sunday, 22 December 2013, a day of mass political protest in Bangkok.[5] The normal Sunday average is 400,000 passengers. The BTS currently has a fleet of 51 four-car trains.
The company implemented a contactless ticketing system in 2007 named "BTS SmartPass", and initially planned to permit BTS and Airport Link passengers to use their RFID smart cards in a single ticketing system. A single ticketing platform for the BTS, MRT, and ARL was to be implemented by late-2015.[6]
Station layout
All of the system's stations are elevated and constructed on three levels.[7] The street level provides access to the station proper via stairs and often escalators. Supporting utility equipment (generators, water tanks) are usually located at this level on traffic islands.
The first elevated level of the stations contains the ticket booths, some small kiosk-like shops, and access control gates. The second level (and third at Siam Station) is again accessed with stairs and escalators and contains the platforms and rails. With the exception of Siam Station, the stations follow a side platform layout. Siam Station uses island platforms to facilitate cross-platform interchange between the two lines. Additionally, many stations have ramps and elevators to allow passengers who use wheelchairs to access the ticketing hall and platforms from the street. The distances between doors are equal throughout the train, regardless of whether they are in the same or different cars, and the locations where the doors will be after the train has stopped are marked on the platform. The platforms are built to accommodate trains of six cars, but trains of only three or four cars are in operation. Security personnel are stationed at every platform and ticketing hall.
Three Skytrain stations, Sala Daeng, Asok, and Mo Chit, are interchanges with the underground MRT system. Saphan Taksin station is connected to the adjacent Sathon Pier where the Chao Phraya Express Boat services call. Many stations are linked by "Skybridges" (overhead pedestrian walkways) to neighbouring buildings and public amenities.
Platform screen doors (half size) were installed at On Nut, Phrom Phong, Asok, Chit Lom, Siam, Phaya Thai, Victory Monument, Sala Daeng, and Chong Nonsi stations in 2014.[8] These will eventually be installed at all stations. The installation at Phrom Phrong Station caused a software problem and a six-hour shutdown of all BTS services on 24 December 2013, leading to gridlock in the city.[9]
Ticketing
For single-trip and stored-value ticket holders, fares are calculated according to distance, but adult, student, senior passes for limited or unlimited train rides are also available. Next to the magnetic fare cards, which require replacement once every two years, the Skytrain has adopted near-field contactless technology in its ticketing system, with the intent of becoming compatible with the system presently used in the MRT.[citation needed]
In May 2012, the new stored-value ticket called Rabbit Card was launched. Rabbit Card is a brand new electronic payment card system that allows holders to pay for the fee of BTS and BRT with only one card.[10] Rabbit Cards can also be used to pay for other services and restaurants that are associated with BTS, for example, McDonald's, Burger King, Starbucks, and others.[11]
Stations and lines
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
At its opening, the BTS had twenty-three stations on its two lines: seventeen on the Sukhumvit Line and six on the Silom Line, with both lines interchanging at Siam. Since then, six additional stations have opened on the Silom Line, and five additional stations have opened on the Sukhumvit Line.
Line | Terminals (District) |
Opened | Newest Extension |
Length | Stations | |
---|---|---|---|---|---|---|
Sukhumvit | Mo Chit (Chatuchak) |
Bearing (Bang Na) |
1999[12] | 2011[12] | 22.25 km[1] | 22[1] |
Silom | National Stadium (Pathum Wan) |
Bang Wa (Phasi Charoen) |
1999[12] | 2013[12] | 14.2 km[1] | 13[1] |
TOTAL (Note: One station, Siam is shared) | 36.45 km[1] | 34[1][2] |
Route extensions
In 2002, the cabinet of then Prime Minister Thaksin Shinawatra amended a law in order to allow a private firm to finance the cost of operating the train system, while the government would take care of all the civil engineering work.
1st extension, Silom Line, south
On 18 October 2005, with no approval from the central government forthcoming, Bangkok Metropolitan Administration (BMA) decided to fund and complete the 2.2 kilometers (1.4 mi) Silom Line route extension to Krung Thonburi Station (S07) and Wongwian Yai Station (S08). Construction began on 13 December 2005 with completion originally expected within two years. However, problems with the tendering and installation of a new Bombardier open signalling system repeatedly pushed back the schedule. The extension finally opening on 15 May 2009. However, the single platform Saphan Taksin Station (originally designed to be only a temporary station) which has only one track has caused repeated delays during rush hour. In 2012, the BMA announced plans to demolish Saphan Taksin Station in the future.
2nd extension, Sukhumvit Line, east
A second extension, the 5.25 km On Nut Station (E09) to Bearing Station (E14) started construction in August 2006.[13] The 4 billion baht extension was again funded by the BMA.[14] The original scheduled opening date was mid-2009. However, an unusual, prolonged delay in the tendering of the contract for the electrical and signals resulted in a two-year delay. "The senior City Hall official responsible for making the purchase has apparently stalled the scheme over fears of being investigated if something went wrong with the purchase,..."[15]
The BTSC was contracted by the BMA to run the extension. Subsequently, the extension did not open until over two years later on 12 August 2011. The delay in opening prompted the BMA to offer free travel for this extension until the end of 2011 as compensation. A flat fare is charged for this section. The fee for this extension is separate from the distance based fare of the rest of the BTS network.
3rd extension, Silom Line, south
The third extension to the network, a 5.3 km, four station extension from Wongwian Yai (S8) to Bang Wa (S12) in Phasi Charoen District began construction in the 2nd quarter of 2011 with a deadline of the end of 2012. Only the stations had to be constructed as the viaduct had been completed some years prior. However, construction was delayed for many months by the Bangkok floods of late-2011. It eventually opened in stages. Pho Nimit opened on 12 January 2013, Talat Phlu opened on 14 February 2013, with the last two stations opening on 5 December 2013.[16] For most of 2013, passengers changed platforms and trains at Wongwian Yai for a shuttle service to S09 and S10 as there was no turnout at S10 for through trains. Since the opening of the final section of the extension to Bang Wa station on 5 December 2013, this is no longer the case.
Summary of BTS Extensions
- 5 December 1999: Sukhumvit Line: Mo Chit – On Nut; Silom Line: National Stadium – Saphan Taksin
- 15 May 2009: Silom Line: Saphan Taksin (S06) – Wong Wian Yai(S08)
- 12 August 2011: Sukhumvit Line: On Nut (E09) – Bearing (E14)
- 12 January 2013: Silom Line: Wong Wian Yai (S08) – Pho Nimit (S09)[17]
- 14 February 2013: Silom Line: Talat Phlu (S10)
- 5 December 2013: Silom Line: Wuttakat (S11); Bang Wa (S12)
Under construction
Sukhumvit Line, south
Construction started in April 2012 for a 12.6 km (7.8 mi), seven station extension from Bearing Station (E14) to Samut Prakan Station (E23). The extension is being built by Ch. Karnchang.[18] Two stations (E18 & E22) will be built at a later date. The extension is funded by the MRTA as it is outside BMA city limits. Construction is contracted to take 1,350 days and the extension is planned to open in 2017. In April 2013, the MRTA awarded Ch Karnchang the contract for track laying and electrical systems.[19] As of June 2014, civil works were stated to be 28.3 percent complete.
Sukhumvit Line, north
- 1) Mo Chit station to Saphan Mai: 11.4 km, 12 stations (N9–N20).
- 2) Saphan Mai to Khu Khot: 7.5 km, four stations (N21-N24).
A 11.4 km, 12 station northern extension from Mo Chit Station to Saphan Mai in Don Mueang District has been planned since the Sukhumvit Line opened. Originally, this extension was scheduled to be completed by 2008. However, due to a combination of changes in government, a prolonged environmental study, and problems with locating a suitable train depot, the extension has been continually delayed.
A further 16.5 km, nine station extension from Saphan Mai to Lam Lukka was also planned once the extension to Saphan Mai had been completed. This was subsequently split into two extensions. A 7.5 km, four station extension to Khu Khot and a 9 km, five station extension along Lam Lukka Road to Lam Lukka.
Due to the significant delay in the northern extension plans, in mid-2013 it was decided by the MRTA to tender extensions (1) & (2) at the same time by the end of 2013. However, the dissolution of parliament in November 2013 delayed this yet again. A tender was finally released in January 2014 [20] with an April deadline before being delayed until late May 2014 due to concerns from bidders.[21]
A military coup in late-May suspended the bidding process while the military administration reviewed all major projects. In late-June, the military administration affirmed the tender which will proceed before the end of 2014. In mid-August, the MRTA announced that the new tender deadline will be 30 September 2014.[22] Five bidders have qualified and successful bids will be announced by December.[23] The contract to construct the line for both extensions (1) & (2) was finally signed in April 2015 with schedule to open in 2020.[24][25]
Future extension plans
Sukhumvit Line, north
A further 9 km, five station extension from Khu Khot Station to Lam Lukka Station is planned to be constructed by 2029.
Sukhumvit Line, east
- A further 7 km, five station extension from Kheha Samut Prakan Station to Bang Pu Station is planned. It may be tendered by 2015-2016 for completion by 2019-2020.
- Long terms plans call for a spur line from Bang Na – Suvarnabhumi Airport (terminating at future South Passenger Terminal of Suvarnabhumi Airport). However, this may also be built as a light rail (monorail) line.
Silom Line, south
After the opening of S11 & S12 on 5 December 2013, the BMA announced a new proposal to further extended the Silom Line by 7 km from Bang Wa (S12) station, by six stations to Taling Chan, where it would connect with the SRT Light Red Line.[26]
If approved, the proposed time frame would be for completion of design by 2015. Construction would be undertaken from 2016-2018 for a planned 2019 opening. Part of the basis for this further extension by the BMA is that it would provide proximate access to the Southern Bus Terminal. This proposal is currently under preliminary study by the BMA.
Silom Line, west
The Silom Line is planned to be extended by one or two stations west along Rama 1 from National Stadium (W1) to link with the SRT Dark Red Line at Yot Se station. However, no time frame for this extension has been announced and this section of the Dark Red Line will not be built before 2018.
Originally, the plan was to extend the Silom Line west from National Stadium into Chinatown, then north to Democracy Monument where it would then run west to Rattanakosin Island and Sanum Luang, tunnel under the river to the Thonburi side before terminating at Phra Nok. However, this plan was shelved in 2009 and much of this route has been replaced by routing changes to the planned MRT Orange Line.
BTS Group Holdings will be bidding to manage more BTS and MRT lines in the future through financing built out of its BTS Rail Mass Transit Growth Infrastructure Fund after it got approval from the Thai Securities and Exchange Commission in March 2013. The IPO raised US$2.1 billion, the largest in Thailand's history.[27]
BTS Skytrain Extension lines | |||||||
---|---|---|---|---|---|---|---|
Line | Colour | Date opening | Terminal | Length /km | Number of stations | Status | |
Sukhumvit Line extension | Light Green | 2017 | Bearing | Kheha Samut Prakan | 12.6 km (7.8 mi) | 7 | Under Construction |
2020 | Mo Chit | Khu Khot | 18.9 km (11.7 mi) | 16 | Under Construction | ||
2019/20 | Kheha Samut Prakan | Bang Pu | 7 km (4.3 mi) | 4 | Planned | ||
2029 | Udom Suk | Suvarnabhumi Airport | ?? | 12 | Planned | ||
2029 | Khu Khut | Eastern Outer Ring | 9 km (5.6 mi) | 4 | Planned | ||
Silom Line extension | Dark Green | 2020+(?) | National Stadium | Yot Se | 2 km (1.2 mi) | 1-2 | Planned |
2019 | Bang Wah | Taling Chan | 7 km (4.3 mi) | 6 | Preliminary study |
Rolling stock
The BTS Skytrain uses two variations of electric multiple unit rolling stock. All operate on 1,435 mm (4 ft 8 1⁄2 in) standard gauge. All trains have four doors on each side per car, an air-conditioning unit, and LCD monitors for public announcement and advertising. The power supply for all trains is at 750 V DC from the third rail.
Siemens train
First order
The rolling stock of BTS Skytrain, in use when the line opened in 1999, consisted of 35 Siemens Modular Metro trains from Siemens AG. These initial trains had three cars, two motor cars and one trailer in the center. The Sukhumvit Line used 20 trains, and the Silom Line had 15.
After the 12 new car CNR trains were delivered for the Silom line in December 2010, the 15 Siemens trains on the Silom Line were transferred to the Sukhumvit Line.
Second order: extra cars to expand to four-car train operations
To increase capacity, in October 2010, BTSC ordered an extra 35 single cars from Siemens to make each train a four car set.[28][29]
These extra cars were progressively introduced into operation from November 2012 to March 2013, when all 35 sets of Siemens rolling stock finally became four car sets.[30]
The Silom Line cars have been modified to support a signaling system from Bombardier Transportation since the extension from Saphan Taksin to Wong Wian Yai.
Changchun trains
First order
In early 2008, the BTSC ordered 12 new trains (12 sets of four cars) from Changchun Railway Vehicles Co. Ltd (EMU B class) to cater for the then soon to open Wong Wian Yai extension of the Silom Line. Their design was modified to the existing BTS's Siemens Modular Metro. The new trains were delivered late and only began service the Silom Line in December 2010. This was some 18 months after the Wong Wian Yai and Krung Thonburi stations were opened in May 2009 during which time there was severe overcrowding on the Silom line.
These trains consist of two-motor cars and two-trailer cars (i.e., four-car trainsets) and feature LCD TVs for public announcements and advertising. An advanced digital voice announcement (DVA) and passenger information systems was installed.
Second order
In September 2011, the BTSC ordered five more four-car trainsets of CNR rolling stock for 1.5 billion baht to prepare for the Silom Line extension to Bang Wa which was then due to open in December 2012.[31] These five new train sets of rolling stock entered service on 29 November 2013 after the first two stations of the Silom Line extension to Bang Wa opened in January and February 2013, respectively. This second batch of CNR EMUs (B Class) differ slightly from the first batch in exterior fitting out such as with the LCDs screens, LED route displays, signage, and passenger communication units.
Ridership
The first years of operations saw limited ridership. The line had few direct ramps into malls and lacked escalators. Little by little, while escalators were installed and side bridges added, patronage increased. The opening of Siam Paragon Mall in 2004, at the time Thailand's most luxurious mall, boosted crowds at the system's central Siam station. The redevelopment of the Ratchaprasong and Siam districts as well as new "skywalks" fostered growing accessibility. Ridership continued to increase with incremental expansion of the line, from 529,466 weekday passengers in 2011[3] to 573,041 in January 2012,[3] to 668,302 in August 2013, surpassing 600,000 passengers daily for all of August.[32] Nowadays at peak hour, the trains sometimes depart without being able to take all waiting passengers. The total number of passenger trips made between 12 May 1999 and 25 September 2013 was 1,794,280,399.[2] Political unrest in Bangkok led to an all-time high Sunday ridership of 760,000, while the subway also hit record highs.[33]
Riders [34] | ||
---|---|---|
No. | Station | Number (People per day) |
1 | Siam Station | 112,600 |
2 | Asok Station | 85,100 |
3 | Mo Chit Station | 79,500 |
4 | Victory Monument Station | 79,000 |
5 | Sala Daeng Station | 52,900 |
6 | On Nut Station | 52,600 |
7 | Chit Lom Station | 47,300 |
8 | Phaya Thai Station | 42,800 |
9 | Bearing Station | 41,400 |
10 | Phrom Phong Station | 39,600 |
See also
- Keeree Kanjanapas
- List of rapid transit stations in Bangkok
- List of rapid transit systems
- MRT (Bangkok)
- Airport Rail Link (Bangkok)
- MRT Brown Line
- MRT Grey Line
- MRT Light Blue Line
- MRT Orange Line
- MRT Pink Line
- MRT Purple Line
- MRT Yellow Line
- SRT Red Lines
- Bangkok BRT
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 2.2 2.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 3.0 3.1 3.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 'Trains gain as rallies clog roads', Bangkok Post, 26 December 2013
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 12.0 12.1 12.2 12.3 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Groundbreaking starts on new BTS extension, Dailynews, 15 August 2006
- ↑ BTS extension budget cut, Bangkok Post, 15 December 2006
- ↑ Skytrain link tests delayed, Bangkok Post, 19 September 2009
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ "Ch Karnchang gets Phase 2 of Bearing-Samut Prakan route" The Nation, 13 April 2013
- ↑ http://www.mrta.co.th/sysRegister/register131217/proc17122556.pdf
- ↑ http://www.prachachat.net/news_detail.php?newsid=1401076541 "รฟม.ปรับทีโออาร์หมอชิต-คูคต กลางปี59 เปิดให้บริการสายสีม่วง" Prachachat News, 26 May 2014
- ↑ http://www.prachachat.net/news_detail.php?newsid=1408439328
- ↑ http://www.matichon.co.th/news_detail.php?newsid=1412581507
- ↑ สร้างรถไฟฟ้าไปคูคตเซ็นสัญญาวันนี้ลงพื้นที่กลางปี, Dailynews, 3 April 2015
- ↑ Bangkok Sukhumvit Line extension contracts, Railway Gazette, 13 April 2015
- ↑ http://www.thairath.co.th/content/region/387159
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
External links
Wikimedia Commons has media related to Lua error in package.lua at line 80: module 'strict' not found.. |
- BTS official web site
- Bangkok BTS | All info you want to know about Bangkok Skytrain
- 2Bangkok.com Skytrain site
- the System Map of Bangkok Rail Transit Network in PDF format
- the Master Plan of Bangkok Transport Network in PDF format
- BTS Info at www.transitbangkok.com
- Bangkok at UrbanRail.net
- Bangkok Post; BTS should record first profit in 2009
- Photo visual guide by travellikeaboss.org