Sweetwater Wind Farm
From Infogalactic: the planetary knowledge core
Sweetwater phase 1 consists of 25 GE 1.5 megawatt S turbines, Sweetwater phase 2 consists of 61 GE 1.5 megawatt SLE turbines, Sweetwater 3 consists of 90 GE 1.5 megawatt XLE turbines.
Sweetwater stage 4 employs 135 Mitsubishi 1.0 megawatt wind turbines and 46 Siemens Wind Power 2.3 megawatt turbines. Its output is being sold to San Antonio’s CPS Energy under a 20-year purchase agreement.[citation needed]
Sweetwater 5 utilizes 35 Siemens 2.3 MW turbines.
See also
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
<templatestyles src="Asbox/styles.css"></templatestyles>
<templatestyles src="Asbox/styles.css"></templatestyles>