Riverside Generating Station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
File:Riverside Generating Station 2.jpg
The Riverside Generating Station with the Francis Scott Key Bridge in the background right

The Riverside Generating Station is a 261 MW electric generating station operated by Exelon that is located at 4000 Broening Highway in Dundalk, Maryland. The station is on Sollers Point on the Patapsco River.[1]

Plant description

Riverside consists of Unit 4, a natural gas-fired steam electric unit with a nominal capacity of 78 MW, Unit 5, an 85 MW steam generating unit, Unit 6, a 135 MW natural gas and fuel oil-fired gas turbine, and Units 7 and 8, each 25 MW natural gas-fired gas turbines.[1] Water from the Patapsco River is used as the heat sink of the condensors of the steam turbines.

History

File:Riverside Generating Station Maryland.JPG
Riverside Generating Station and adjacent electrical substation.

The site of the Riverside Generating Station was originally purchased by the Consolidated Gas and Light Company of Baltimore, a predecessor company to Constellation Energy, in 1922 for the location of a manufactured gas facility that was never built.[2] In 1942, the 60 MW steam turbine and boiler Unit 1 was installed at a cost of US$6.5 million.[2] Two additional 60 MW steam electric units, Unit 2 and Unit 3, were placed in service in 1944 and 1948,[2] and Units 4 and 5 entering commercial operation in 1951. Units 1, 2, 3, and 5 were shut down in 1993.[1]

In 2008, authorization was granted to modify and reactivate Unit 5 to operate only on natural gas[3] at an estimated cost of US$25 million.[1] Constellation Energy merged into Exelon in 2012. Exelon announced plans to shut down Unit 4 by mid-2016.[4]

Operations

Exelon normally operates the Riverside Generating Station as a peaking power plant. As the mid-Maryland region is a summer peaking load, the majority of the plant's operating time will be during hot summer days. The Riverside Generating Station is dispatched by the PJM Interconnection regional transmission organization.

See also

References

<templatestyles src="Reflist/styles.css" />

Cite error: Invalid <references> tag; parameter "group" is allowed only.

Use <references />, or <references group="..." />

External links

Lua error in package.lua at line 80: module 'strict' not found.

  1. 1.0 1.1 1.2 1.3 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
  3. Maryland Public Service Commission Order No. 82006 (May 12, 2008).
  4. Lua error in package.lua at line 80: module 'strict' not found.