NEL pipeline
Constructions south of Schwerin
Constructions south of Schwerin
Location
Country Germany
General direction east-west
From Lubmin
Passes through Sülstorf
Achim
To Rehden
General information
Type Natural gas
Owner NEL Gastransport GmbH
Partners W & G Beteiligungs-GmbH & Co. KG (partnership of Wingas and Gazprom)
E.ON
Gasunie
Fluxys
Construction started 2011
Commissioned 2012 (first stage)
2013 (second stage)
Technical information
Length Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Maximum discharge 20 billion cubic metres per annum (710×10^9 cu ft/a)
Diameter Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).

The NEL (Nordeuropäische Erdgasleitung, English: Northern European natural gas pipeline, formerly known as Norddeutsche Erdgasleitung) is a 440 kilometres (270 mi) long natural gas pipeline in Germany.

Route

The pipeline runs from Lubmin near Greifswald through Sülstorf and Achim to Rehden. It connects the Nord Stream pipeline with the Rehden-Hamburg gas pipeline and MIDAL pipeline. Together with MIDAL it creates a Greifswald-Bunde[disambiguation needed] connection. The pipeline started operations on 5 November 2012.[1] Between Sülstorf and Achim, it is using existing network.[2]

Technical features

The diameter of the pipeline is 56 inches (1,400 mm) and it uses 100 bars (10,000 kPa) operating pressure.[3] Its capacity is 20 billion cubic metres (710 billion cubic feet) of natural gas per year.[3][4] The pipeline is expected to cost around €1 billion.[5]

The developer of the pipeline asked exemption from the network access and transit fees regulation; however, this request was denied.[6]

Project company

The pipeline was built by OPAL NEL TRANSPORT GmbH, a subsidiary of W & G Beteiligungs-GmbH & Co. KG (W & G).[7] It is operated by NEL Gastransport GmbH.[3] The shareholders of NEL are W & G Beteiligungs-GmbH & Co. KG (partnership of Wintershall Holding GmbH and Gazprom - 51%), E.ON Ruhrgas (10%), Gasunie (20%), and Fluxys (19%).[5]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. http://www.nel-gastransport.de/en/our-network/the-north-european-natural-gas-pipeline/
  3. 3.0 3.1 3.2 Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.

External links


Lua error in package.lua at line 80: module 'strict' not found.