NEL pipeline
NEL pipeline | |
---|---|
Constructions south of Schwerin
Constructions south of Schwerin
|
|
Location | |
Country | Germany |
General direction | east-west |
From | Lubmin |
Passes through | Sülstorf Achim |
To | Rehden |
General information | |
Type | Natural gas |
Owner | NEL Gastransport GmbH |
Partners | W & G Beteiligungs-GmbH & Co. KG (partnership of Wingas and Gazprom) E.ON Gasunie Fluxys |
Construction started | 2011 |
Commissioned | 2012 (first stage) 2013 (second stage) |
Technical information | |
Length | Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). |
Maximum discharge | 20 billion cubic metres per annum (710×10 9 cu ft/a) |
Diameter | Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). |
The NEL (Nordeuropäische Erdgasleitung, English: Northern European natural gas pipeline, formerly known as Norddeutsche Erdgasleitung) is a 440 kilometres (270 mi) long natural gas pipeline in Germany.
Route
The pipeline runs from Lubmin near Greifswald through Sülstorf and Achim to Rehden. It connects the Nord Stream pipeline with the Rehden-Hamburg gas pipeline and MIDAL pipeline. Together with MIDAL it creates a Greifswald-Bunde[disambiguation needed] connection. The pipeline started operations on 5 November 2012.[1] Between Sülstorf and Achim, it is using existing network.[2]
Technical features
The diameter of the pipeline is 56 inches (1,400 mm) and it uses 100 bars (10,000 kPa) operating pressure.[3] Its capacity is 20 billion cubic metres (710 billion cubic feet) of natural gas per year.[3][4] The pipeline is expected to cost around €1 billion.[5]
The developer of the pipeline asked exemption from the network access and transit fees regulation; however, this request was denied.[6]
Project company
The pipeline was built by OPAL NEL TRANSPORT GmbH, a subsidiary of W & G Beteiligungs-GmbH & Co. KG (W & G).[7] It is operated by NEL Gastransport GmbH.[3] The shareholders of NEL are W & G Beteiligungs-GmbH & Co. KG (partnership of Wintershall Holding GmbH and Gazprom - 51%), E.ON Ruhrgas (10%), Gasunie (20%), and Fluxys (19%).[5]
See also
References
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.nel-gastransport.de/en/our-network/the-north-european-natural-gas-pipeline/
- ↑ 3.0 3.1 3.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
External links
Wikimedia Commons has media related to NEL Pipeline. |
Lua error in package.lua at line 80: module 'strict' not found.