Liverpool2
Liverpool2 is an extension to the Seaforth Dock container terminal built by Peel Ports that is scheduled to be operational in 2016.[1] The terminal extension will be able to accommodate two "post-Panamax vessels simultaneously".[2][3] The terminal is being built on reclaimed land using material dredged from the River Mersey. The dredged material provides the necessary clearance in the approach channels for visiting ships.[4]
An upgrade to the Canada Dock Line was announced in May 2016 that would allow up to 48 trains a day to visit the port. Upgrade of the line is expected to be complete by 2019.[5]
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
Lua error in package.lua at line 80: module 'strict' not found.
![]() |
Wikimedia Commons has media related to Liverpool2. |
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.railtechnologymagazine.com/Rail-News/rail-upgrades-promised-as-part-of-port-of-liverpool-developments