Calico Solar Energy Project
Calico Solar Energy Project | |
---|---|
Location of Calico Solar Energy Project in California
|
|
Country | United States |
Location | San Bernardino County, California |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Proposed |
Solar field | |
Type | Flat-panel PV |
Power generation | |
Nameplate capacity | 618 MW |
The Calico Solar Energy Project, now shelved,[1] was a proposed photovoltaic power station to be located in San Bernardino County, California on 4,600 acres (1,900 ha) of Bureau of Land Management land. It will be mixed design of 618 MW fixed tilt and dual axis photovoltaics.[2][3]
Originally it was stirling engine design and the company involved was Tessera Solar.[4] The project was approved by Ken Salazar, Secretary of the Interior, on October 20, 2010. On December 1 project received approval from the California Energy Commission, but on December 23 Southern California Edison decided to cancel its power purchase agreement for the project. Then project was sold to K Road, and redesigned using photovoltaics.
<templatestyles src="Stack/styles.css"/>
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Reuters: California Unions for Reliable Energy Partners with K Road Calico Solar Project
- ↑ Calico Solar Project
- ↑ Top 6 Utility-scale Fast-tracked Solar Projects Renewable Energy World, September 1, 2010.