CR4000

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
CR4000 Flexity Swift
Beckenham Junction tramstop look west with Tram 2543.JPG
Tram 2543 at Beckenham Junction tramstop
In service 2000–Present
Manufacturer Bombardier Transportation and Vossloh-Kiepe
Built at Bautzen, Germany
Vienna, Austria
Assembly and testing
Family name Flexity Swift
Constructed 1998–2000
Refurbishment 2008–2009, Deep cleaned, new livery and new seats
Number built 24
Number in service 24
Formation 2 cars per tram, articulated centre
Fleet numbers 2530–2553
Capacity 70 seats, 138 standing per tram
Operator(s) London Tramlink (Tramlink) part of TfL
Depot(s) Therapia Lane, Croydon
Line(s) served 4 routes
Specifications
Car body construction Aluminium
Train length 30.10 m (98 ft 9 in)
Width 2.65 m (8 ft 8 in)
Height 3.67 m (12 ft 0 in)
Floor height 350 mm (13.8 in) – 400 mm (15.7 in)
Platform height 350 mm (13.8 in)
Entry 350 mm (13.8 in)
Doors 8 'plug doors' per set
Articulated sections 1
Maximum speed 50 mph (80 km/h)
Weight 36.3 tonnes (35.7 long tons; 40.0 short tons) per tram
Traction system 4x 120 kW (161 hp) Bombadier Three-phase AC traction motors
Acceleration 1.3 m/s2 (4.3 ft/s2) (2.9 mph per second; 4.7 km/h per second)
Electric system(s) 750 V DC Overhead
Current collection method Pantograph
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

The CR4000 is a 76% low floor model of Flexity Swift tram built by Bombardier Transportation in Bautzen and Vienna between 1998 and 2000 and operated by London Tramlink.

The CR4000

The trams are six-axle single-articulated double-ended cars, with four doors on each side. The low floor section stretches between both the outer doors through the articulation (which rests on an unpowered bogie). Each tram has an integral traction braking controller with deadman's handle. While stationary, the tram is immobilised until the driver's hand is on the controller: if the driver's hand is removed from the controller while moving, an alarm sounds immediately and the driver's hand must return to the controller to disarm it. If a three-second countdown passes and it is not disarmed, the track brakes are applied. Between the outer door and each car end is a higher-floor section, accessed up a step and situated over the car's two power bogies. The low-floor section is 40 cm (16 in) above rail-level, sloping down to 35 cm (14 in) in the doorways, a height that matches the platforms at tram stops, and each car has two wheelchair positions. The trams are 30.1 m (99 ft) long and 2.65 m (8 ft 8 in) wide, with 70 seats and a total capacity of just over 200 passengers. They operate from an overhead power supply at 750 V DC, and have a maximum speed of 80 km/h (50 mph). They are based on the very similar class K-4000 built for use on Cologne's low-platform routes. The fleet is maintained at Therapia Lane depot. The trams are numbered beginning at 2530, continuing from the highest-numbered tram, number 2529 on London's former tram network, which closed in 1952.

Trams were originally fitted with destination blinds, which showed the route number, ultimate destination and intermediate points. These were replaced during 2006 with electronic destination indicators which show only the final destination of the tram. 2535 was named Stephen Parascandolo 1980-2007 at a special ceremony at Beckenham Junction on Saturday 21 October 2007. It is named after the webmaster of the Unofficial Croydon Tramlink website who died at the age 26 following a road accident

Refurbishment

All 24 trams were refurbished between 2008 and 2009, which involved a deep clean, installation of new seats and a new lime green, blue and white external livery.[1] The fleet is also progressively being fitted with new front LED lights. 2534 was the first to receive them following a collision with a Warburtons Lorry. Since then, cars 2531-2536, 2536-2544, 2546 and 2548-2553 have been fitted with the new front lights. 2553 was involved in a serious road traffic accident and was taken out of service for a number of months. It has recently returned to service after being repaired at the Therapia Lane depot, and during the repair a "refresh" was also carried out. The "refresh" involved a deep clean of all floorings, as well as a full interior repaint and repaint of all handrails and overhead handles.[2]

diagram of a Tramlink Flexity Swift tram

See also

References

<templatestyles src="Reflist/styles.css" />

Cite error: Invalid <references> tag; parameter "group" is allowed only.

Use <references />, or <references group="..." />

External links

  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.
  • CR4000 tram spec sheet Bombardier
  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. http://www.greaterlondonphotos.co.uk/london-tramlink-2553-refresh.html