Albany Crown Tower
Albany Crown Tower | |
---|---|
250px
Render of how the tower was expected to look when completed
|
|
General information | |
Status | Never built |
Type | Hotel / Offices / Residential[1] |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Estimated completion | Unknown |
Cost | £83 million[2] |
Height | |
Roof | Over 160 m (520 ft)[1] |
Technical details | |
Floor count | 54[1] |
Design and construction | |
Architect | Ian Simpson[3] |
Developer | Albany Crown[1] |
The Albany Crown Tower (or the Albany Tower) was a planned development on Aytoun and Auburn Streets in Manchester England.[4] It would have fronted onto the Rochdale Canal[1] not far from Piccadilly Station and been one of the tallest buildings in Manchester projected to cost £83 million.[2] It was designed by Ian Simpson,[3] for Albany Crown.[1]
Planning permission was given in 2005 but construction never commenced and the developer entered administration in May 2010.
History
The mixed-use tower's proposed height was 131 m (430 ft), it had 44 floors,[3] providing 35,298.00 square metres of space.[2] The ground floor comprised retail space, while floors 1 to 23 (140,000 square feet of space) would be a hotel and floors 24 to 41 residential, with a penthouse on the top two floors.[5] In total there will be 237 flats.[1] In May 2007, Albany proposed adding a further 10 storeys increasing its height to 160 m (525 ft).[1] Adjoining the tower was a smaller, 11-storey structure, at 49 m (160 ft), with approximately 14,500 square metres of space[2] to be occupied by retail and offices.[5]
A planning application was submitted in February 2005.[6] Albany then purchased the site in October 2005[7] for £6 million.[1] Planning permission was approved on the 11 November 2005.[6]
The site was occupied by five-storey offices designed by David Thomson in 1936 and built between 1948 and 1951 when the architect E H Montague Ebbs took over the project,[8] and occupied by a Labour Exchange,[1] part of the Department of Employment.[9] It was proposed to be demolished in early 2006 but demolition started in 2104. A hotel run by Holiday Inn is currently under construction on the site.[8]
The project stalled due to the failure of Albany Assets to sell apartments in its other developments.[2][10]
Albany Crown entered administration in May 2010 and the construction of the hotel finally put paid to the chance of the skyscraper ever being constructed.[11]
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 2.2 2.3 2.4 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 3.0 3.1 3.2 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 5.0 5.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 8.0 8.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.[dead link]
- ↑ Lua error in package.lua at line 80: module 'strict' not found.