Bannered routes of U.S. Route 27
U.S. Route 27 | |
---|---|
Lua error in Module:Infobox_road/map at line 16: attempt to index field 'wikibase' (a nil value). | |
Highway system | |
There are at least thirteen current and three former bannered routes of U.S. Route 27.
Contents
- 1 Williston–Perry alternate
- 2 Attapulgus business loop
- 3 Bainbridge business loop
- 4 Blakely business loop
- 5 Cuthbert business loop
- 6 Lumpkin connector
- 7 Bremen business loop
- 8 Buchanan business loop
- 9 Cedartown business loop
- 10 Columbus–Carrollton alternate
- 11 Rome loop
- 12 LaFayette business loop
- 13 Nicholasville business route
- 14 Former routes
- 15 References
Williston–Perry alternate
U.S. Highway 27 Alternate |
|
---|---|
Location: | Williston–Perry, Florida |
Length: | 93.281 mi[1] (150.121 km) |
An Alternate U.S. 27 routing exists in Florida. It is signed north–south, but is a primarily east–west route, running between Perry and Williston. ALT US 27 is concurrent with US 19-98 from Perry to Chiefland, and also has the hidden FDOT designation of State Road 55. Between Chiefland and Williston it is (hidden) SR 500. The entire length of the route is 93 miles (150 km).
Alternate U.S. 27 is one of the primary routes between northwest and central Florida, having been recently been four-laned along its entire route. With a signed speed limit of 65 mph (105 km/h), this gives it more capacity than the mostly-two-lane mainline route.
County | Location | mi[1] | km | Destinations | Notes | ||
---|---|---|---|---|---|---|---|
Levy | Williston | 0.000 | 0.000 | US 27 / US 41 north / SR 121 north (North Main Street / East Noble Avenue / SR 500 south / SR 45 north) – Archer, Gainesville, Ocala | |||
0.525 | 0.845 | US 41 south / SR 121 south (Southwest 7th Street / SR 45) – Dunnellon, Tampa | north end of US 41 / SR 45 / SR 121 overlap | ||||
| 2.945 | 4.740 | CR 335A | ||||
| 4.820 | 7.757 | CR 241 north (Northeast 150th Avenue) | ||||
| 9.426 | 15.170 | CR 335 east | ||||
Bronson | 11.985 | 19.288 | CR 337 north (Court Street) | ||||
12.094 | 19.463 | CR 337 south – Henry Beck Park | |||||
12.559 | 20.212 | SR 24 (Thrasher Drive) – Cedar Key, Archer | |||||
| 14.203 | 22.858 | CR 32 east | ||||
| 14.846 | 23.892 | CR 339A south – Blue Springs | ||||
| 15.785 | 25.403 | CR 339 north – Trenton | ||||
| 19.107 | 30.750 | CR 339A north (Northeast 20th Avenue) | ||||
| 22.101 | 35.568 | CR 134 (Northwest 10th Avenue) – Levyville | ||||
Turkeytown | 24.110 | 38.801 | CR 345 north / CR 347 south (Northwest 30th Avenue) | ||||
Chiefland | 25.468 | 40.987 | SR 345 south | ||||
26.652 | 42.892 | US 19 south / US 98 south (SR 55) – Inglis, Cedar Key, St. Petersburg | north end of SR 500 overlap; south end of SR 55 overlap | ||||
see US 19 (mile 148.043-214.672) | |||||||
Taylor | Perry | 93.281 | 150.121 | US 19 north / US 27 / US 98 west / US 221 Truck north (Hampton Springs Avenue / Byron Butler Parkway / SR 20 / SR 30 west) – Tallahassee |
|||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Attapulgus business loop
U.S. Highway 27 Business |
|
---|---|
Location: | Attapulgus, Georgia |
Length: | 3.473 mi[2] (5.589 km) |
US 27 Bus. / SR 1 Bus. is a 3.473 miles (5.589 km)-long business branch of US 27 and SR 1 in Attapulgus, which leaves the main route of US 27 and SR 1 at mile 6.349, and heads northwest in the direction of downtown Attapulgus, angling west through the heart of the town, and then turning sharply north at the western edge of Attapulgus to meet US 27/SR 1 again at mile 9.225.
Bainbridge business loop
U.S. Highway 27 Business |
|
---|---|
Location: | Bainbridge, Georgia |
Length: | 3.064 mi[2] (4.931 km) |
US 27 Bus. / SR 1 Bus. in Bainbridge continues north into Bainbridge at mile 18.627, where the main route of US 27 starts its concurrency going west with US 84 and SR 38 around town. US 27 Bus runs to its intersection with the US 84 Bus/SR 38 Bus branch originating east of Bainbridge, and runs west for a short distance, co-signed with these two routes. US 27 Bus then turns sharply north again at Broad Street, where it starts a concurrency with SR 97 and SR 309. The route splits from SR 97 and SR 309 after a short distance, and runs northwest to its terminus as it rejoins the main US 27 route out of Bainbridge, and is briefly co-signed with SR 253 during this portion. The entire route is in Bainbridge, Decatur County.
mi[2] | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | US 27 / US 84 / SR 1 / SR 38 | Southern terminus of US 27 BUS/SR 1 BUS | ||
0.934 | 1.503 | US 84 Bus. / SR 38 Bus. |
Eastern terminus of concurrency with US 84 BUS/SR 38 BUS | ||
1.394 | 2.243 | US 84 Bus. / SR 38 Bus. / SR 97 / SR 309 |
Western terminus of concurrency with US 84 BUS/SR 38 BUS; southern terminus of concurrency with SR 97 and SR 309 | ||
1.759 | 2.831 | SR 97 / SR 309 | Northern terminus of concurrency with SR 97 and SR 309 | ||
2.508 | 4.036 | File:Georgia 253.svg SR 253 | Eastern terminus of concurrency with SR 253 | ||
2.887 | 4.646 | File:Georgia 253.svg SR 253 | Western terminus of concurrency with SR 253 | ||
3.064 | 4.931 | US 27 / US 84 / SR 1 / SR 38 | Northern terminus of US 27 BUS/SR 1 BUS | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Blakely business loop
U.S. Highway 27 Business |
|
---|---|
Location: | Blakely, Georgia |
Length: | 4.315 mi[2] (6.944 km) |
US 27 Bus. / SR 1 Bus. in Blakely is also named Main Street, and runs south-to-north through the center of town. The business route is also co-signed with SR 39 for a majority of its length, and is further co-signed with SR 62 from just south of to the eastern portion of Courthouse Square around the Early County Courthouse.
The entire route is in Blakely, Early County.
mi[2] | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | US 27 / SR 1 | Southern terminus of US 27 BUS/SR 1 BUS | ||
0.900 | 1.448 | SR 39 | Southern terminus of concurrency with SR 39 | ||
1.574 | 2.533 | SR 62 | Southern terminus of concurrency with SR 62 | ||
1.755 | 2.824 | SR 62 | Northern terminus of concurrency with SR 62 | ||
2.754 | 4.432 | SR 39 / SR 62 Byp. | Northern terminus of concurrency with SR 39 | ||
4.315 | 6.944 | US 27 / SR 1 | Northern terminus of US 27 BUS/SR 1 BUS | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Cuthbert business loop
U.S. Highway 27 Business |
|
---|---|
Location: | Cuthbert, Georgia |
Length: | 3.297 mi[2] (5.306 km) |
US 27 Bus. / SR 1 Bus. in Cuthbert is also named Blakely Street south of the Randolph County Courthouse square, and Court Street north of the square. The route runs south-to-north through the heart of town, crossing US 82 and SR 50 at the courthouse square.
The entire route is in Cuthbert, Randolph County.
mi[2] | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | US 27 / SR 1 | Southern terminus of US 27 BUS/SR 1 BUS | ||
1.705 | 2.744 | US 82 / SR 50 | |||
3.297 | 5.306 | US 27 / SR 1 | Northern terminus of US 27 BUS/SR 1 BUS | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Lumpkin connector
State Route 1 Connector | |
---|---|
Location: | Lumpkin, Georgia |
State Route 1 Connector (SR 1 Connector) is an old alignment of US 27, but currently carries only a designation related to State Route 1, US 27's assigned state route number. It is a short south-to-north connecting route in Lumpkin between SR 27, also named Broad Street, which runs west-to-east through the heart of downtown, to US 27/SR 1 north of Lumpkin. SR 1 Connector is also called Chestnut Street; however, Chestnut Street extends south of SR 26, while the SR 1 Connector designation is only valid of the portion north of SR 27.
The entire route is in Lumpkin, Stewart County.
mi[2] | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | SR 27 | Southern terminus of SR 1 Connector | ||
0.120 | 0.193 | SR 39 Conn. | |||
0.719 | 1.157 | US 27 / SR 1 | Northern terminus of SR 1 Connector | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Bremen business loop
U.S. Highway 27 Business |
|
---|---|
Location: | Bremen, Georgia |
Length: | 4.748 mi[2] (7.641 km) |
US 27 Bus. / SR 1 Bus. in Bremen swings through downtown Bremen from just north of I-20, from a southern terminus in Carroll County, while US 27 bypasses the town to the west. The route crosses US 78 and SR 8 in the heart of downtown.
The entire route is in Bremen, Haralson County.
mi[2] | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | US 27 / SR 1 | Southern terminus of US 27 BUS/SR 1 BUS | ||
2.374 | 3.821 | US 78 / SR 8 | |||
4.748 | 7.641 | US 27 / SR 1 | Northern terminus of US 27 BUS/SR 1 BUS | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Buchanan business loop
U.S. Highway 27 Business |
|
---|---|
Location: | Bremen, Georgia |
Length: | 2.397 mi[2] (3.858 km) |
US 27 Bus. / SR 1 Bus. in Buchanan heads through downtown Buchanan from south to north, while US 27 bypasses the town to the east. The route crosses SR 120 in the heart of downtown.
The entire route is in Buchanan, Haralson County.
mi[2] | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | US 27 / SR 1 | Southern terminus of US 27 BUS/SR 1 BUS | ||
1.417 | 2.280 | SR 120 | |||
2.397 | 3.858 | US 27 / SR 1 | Northern terminus of US 27 BUS/SR 1 BUS | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Cedartown business loop
U.S. Highway 27 Business |
|
---|---|
Location: | Cedartown, Georgia |
Length: | 4.222 mi[2] (6.795 km) |
US 27 Bus. / SR 1 Bus. in Cedartown runs south-to-north through downtown Cedartown, while US 27 swings to the east of town, and is concurrent with SR 100 for the first portion of the route.
The entire route is in Cedartown, Polk County.
mi[2] | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | US 27 / SR 1 / SR 100 | Southern terminus of US 27 BUS/SR 1 BUS; southern terminus of concurrency with SR 100 | ||
1.272 | 2.047 | US 278 / SR 8 / SR 100 | Northern terminus of concurrency with SR 100 | ||
4.222 | 6.795 | US 27 / SR 1 | Northern terminus of US 27 BUS/SR 1 BUS | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Columbus–Carrollton alternate
U.S. Highway 27 Alternate |
|
---|---|
Location: | Columbus–Carrollton, Georgia |
<templatestyles src="Module:Hatnote/styles.css"></templatestyles>
Alternate US 27 is an alternate route of US 27 from Columbus to Carrollton in the U.S. state of Georgia. While the main line of US 27 passes through LaGrange, Alternate US 27 veers to the east to serve the towns of Warm Springs and Newnan.
Rome loop
State Route 1 Loop | |
---|---|
Location: | Rome, Georgia |
Length: | 11.758 mi[2] (18.923 km) |
State Route 1 Loop (SR 1 Loop) is not related to US 27, but to its concurrent state route number, State Route 1. It forms a partial loop around downtown Rome, which starts west of the US 27 main route on SR 20, runs first north, then west, and crosses the main route of US 27 in Mount Berry north of Rome. The loop then continues to run clockwise west and south to meet its southern terminus, again at SR 20 and its concurrency with US 411.
The entire route is in Rome, Floyd County.
mi[2] | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | SR 20 | Northern/western terminus of SR 1 Loop | ||
3.691 | 5.940 | US 27 / SR 1 / SR 53 Spur | Western terminus of concurrency with SR 53 Spur | ||
6.296 | 10.132 | SR 53 Spur | Eastern terminus of concurrency with SR 53 Spur | ||
8.878 | 14.288 | SR 293 | |||
11.758 | 18.923 | US 411 / SR 20 | Southern/eastern terminus of US 411 BUS/SR 20 | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
LaFayette business loop
U.S. Highway 27 Business |
|
---|---|
Location: | LaFayette, Georgia |
Length: | 3.344 mi[2] (5.382 km) |
US 27 Bus. / SR 1 Bus. in LaFayette runs through the heart of downtown, while the main route of US 27 runs just east of town.
The entire route is in LaFayette, Walker County.
mi[2] | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | US 27 / SR 1 / SR 100 | Southern terminus of US 27 BUS/SR 1 BUS | ||
1.036 | 1.667 | SR 193 | |||
3.344 | 5.382 | US 27 / SR 1 | Northern terminus of US 27 BUS/SR 1 BUS | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Nicholasville business route
U.S. Route 27 Business |
|
---|---|
Location: | Nicholasville, Kentucky |
Length: | 3.890 mi[3] (6.260 km) |
US 27 Bus. in Nicholasville runs through the heart of downtown, while the main route of US 27 runs just west of town.
The entire route is in Nicholasville, Jessamine County.
mi[3] | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.000 | 0.000 | US 27 | Southern terminus | ||
2.180 | 3.508 | KY 29 south (West Maple Street) / KY 39 south (East Maple Street) | |||
2.322 | 3.737 | KY 169 north (West Oak Street) / East Oak Street | South end of KY 169 overlap | ||
2.380 | 3.830 | KY 169 south (Richmond Avenue) | North end of KY 169 overlap | ||
3.890 | 6.260 | US 27 (Lexington Road) | Northern terminus | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Former routes
Lake Weir alternate
|
|
---|---|
Location: | Belleview–Lady Lake, Florida |
Existed: | ?–1980 |
An Alternate U.S. 27 around Lake Weir, from Belleview to Lady Lake, existed until 1980. This was also co-signed with Alternate U.S. 441, and today is a bi-county maintained segment of County Road 25.
Polk County alternate
U.S. Highway 27 Alternate |
|
---|---|
Location: | Haines City–Sunray Deli Estates, Florida |
Existed: | 1949–1998 |
Another Alternate U.S. 27 existed in Polk County from Haines City to Sunray Deli Estates. This bannered route was deleted in 1998. Nevertheless, some road maps and atlases still continue to show it. The road is now known as State Road 17.
Avon Park–Sebring alternate
U.S. Highway 27 Alternate |
|
---|---|
Location: | Avon Park–Sebring, Florida |
Existed: | 1949–1979 |
A third Alternate U.S. 27 existed from Avon Park to Sebring Southgate. It was deleted in 1979, and is also part of State Road 17.