Northgate station (Sound Transit)

From Infogalactic: the planetary knowledge core
(Redirected from Northgate (Link station))
Jump to: navigation, search
Northgate
Future Light Rail Station
Location Northgate, Seattle, Washington
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Operated by Sound Transit
Line(s) Northgate Link Extension
History
Opening 2021
Services
Preceding station   Sound Transit logo simplified.svg Link Light Rail   Following station
Northgate Link Extension
Under Construction
Terminus
Terminus Lynnwood Link Extension
Planned
toward Lynnwood

Northgate Station will be an elevated light rail station on the Northgate Link Extension of Sound Transit in the Northgate neighborhood of Seattle. It is scheduled to open along with the rest of the Northgate Link project in 2021. Sound Transit estimates that there will be 15,000 daily boardings at the station in 2030.[1]

Location

The Northgate Station will be about 25 feet above ground-level, just west of 1st Ave NE, spanning NE 103rd St. It will have two entrances, with the north entrance at the northeast corner of 1st Ave NE and NE 103rd St, and the south entrance on part of what is now the Northgate Transit Center. The north entry is on the same super-block as Northgate Mall and may have a direct connection to the mall. There will be tail and pocket tracks north of the station as it will serve as a terminus for a few years before the extension to Lynnwood is completed.[2]

A pedestrian bridge over Interstate 5 is under consideration to improve walking access to North Seattle College and the Licton Springs neighborhood. Two different designs are under consideration: tied-arch or tube/truss.[3] The bridge, estimated to cost $25 million, was allocated $5 million in funding each by Sound Transit and the Seattle Department of Transportation.[4] The remaining $15 million must be found by July 2015, or the funds will be used on other Northgate-area improvements.[5] A federal Transportation Investment Generating Economic Recovery (TIGER) grant application was not approved, but two Seattle council members asked to have the July deadline removed.[6] Money for the project was included in a property-tax levy for safety improvements, to go before Seattle voters in November 2015.[7]

References

<templatestyles src="Reflist/styles.css" />

Cite error: Invalid <references> tag; parameter "group" is allowed only.

Use <references />, or <references group="..." />
  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.